18.10.2026 21:53 przez John Demo
10.08.2026 13:43 przez John Demo
The customer is interested in expanding the installation in the future with additional panels.
Preferred installation time within the next 6 weeks.
The customer pointed out the installation aesthetics - the panels should be mounted to be as little visible from street level as possible.
During the technical inspection, it was noticed that one part of the roof slope requires reinforcement - consultation with a structural engineer is needed.